{"product_id":"roofing-replacements-structural-reinforcements","title":"Roofing Replacements \u0026 Structural Reinforcements","description":"\u003ch2\u003eProfessional Loading Dock Extensions That Maximize Your Facility's Energy Efficiency\u003c\/h2\u003e\n\u003cp\u003eGet a Reno designs and builds loading dock extensions that add dock positions, increase throughput, and keep your facility running during construction. Whether you need to push the physical footprint outward, convert grade-level access to dock-height, or add modular pre-fabricated extensions, our team handles every phase from site assessment through final handover. The result: more usable square footage for loading and unloading, fewer truck queues, and operations that keep pace with growing shipping volumes.\u003c\/p\u003e\n\u003ch2\u003eWhy You'll Love Working With Get a Reno\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cstrong\u003eExpert Planning and Design\u003c\/strong\u003e – Get a Reno's engineers assess your facility's structural loads, truck approach geometry, and forklift traffic patterns before drafting a single plan. Loading dock contractors conduct site assessments and engineering for traffic flow and load capacity, and we treat that step as non-negotiable.\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cstrong\u003eMinimal Operational Disruption\u003c\/strong\u003e – Get a Reno phases construction so your existing dock doors stay active. Overlapping fabrication with site prep (the same method that allowed one service center to raise route capacity from 25 to 40) keeps downtime measured in days, not weeks.\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cstrong\u003eCost-Effective Capacity Gains\u003c\/strong\u003e – A common rule is one dock position per 10,000 square feet of warehouse. Adding positions through extensions costs a fraction of new construction while delivering the same throughput increase. National averages for full loading dock remodels in 2026 fall between $5,119 and $8,319 per assembly grouping; Get a Reno provides detailed and transparent bidding so you see exactly where every dollar goes.\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cstrong\u003eBuilt for Long-Term Durability\u003c\/strong\u003e – Structural steel with minimum yield strength of 55 ksi, reinforced concrete, non-slip tread plate, and welded lip hinges form the backbone of every Get a Reno extension. Dock levelers can handle capacities from 25,000 to 80,000 pounds, and we size every component to match your actual equipment loads.\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cstrong\u003eSingle Point of Contact\u003c\/strong\u003e – Get a Reno manages subcontractor coordination for tasks like electrical work and heavy excavation, so you deal with one team from consultation through completion.\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2\u003eWhat Makes Get a Reno Different\u003c\/h2\u003e\n\u003cp\u003eMost contractors treat a loading dock extension as simple concrete work and steel erection. Get a Reno builds each extension as an integrated system across the full dock area: the dock leveler, dock seals, dock bumpers, vehicle restraint, dock lights, and overhead doors are all specified together so nothing conflicts at install.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSpecialized Loading Dock Expertise\u003c\/strong\u003e – Get a Reno's team understands the difference between static and dynamic loads, and why the IBC requires a 30% impact allowance when forklift traffic crosses a leveler. That knowledge prevents undersized structures and the safety incidents that follow.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eIntegrated System Approach\u003c\/strong\u003e – Extending a loading dock involves more than adding a platform. Get a Reno coordinates pit style dock leveler installation, which serves as the bridge between the dock floor and trailer bed, dock shelter mounting, dock seal placement, and electrical connections for dock lights and traffic lights into a single project scope. Dock seals create an air-tight seal with foam pads to prevent significant energy loss over time, with close attention to corners for proper sealing and safe enclosure, and dock shelters cover trailers with industrial fabric curtains to accommodate a variety of trailer sizes while sealing along the trailer sides. Overhead door and loading dock door sizing also has to align with trailer openings and seal fit. Both reduce energy loss; a single dock opening can exchange 16,000 cubic feet of air per minute without proper sealing.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eFuture-Ready Planning\u003c\/strong\u003e – Get a Reno designs extensions to accommodate growth: reinforced foundations that accept additional new pits later, conduit runs for future dock equipment, and structural capacity for heavier levelers if your fleet changes.\u003c\/p\u003e\n\u003ch2\u003eHow Get a Reno's Loading Dock Extension Process Works\u003c\/h2\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cstrong\u003eSite Assessment and Planning\u003c\/strong\u003e Get a Reno evaluates your existing dock configuration, floor slab condition, drive approach grade, drainage, and structural requirements, with early coordination between civil, structural, and dock equipment teams as part of the planning stage. Standard dock height in North America is 48 inches; we verify your existing elevation and trailer bed heights to determine leveler type and lip reach. Contractors should provide a realistic schedule detailing all phases of construction, and Get a Reno delivers that schedule at this stage.\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cstrong\u003eCustom Design and Construction\u003c\/strong\u003e Based on assessment data, Get a Reno engineers the extension. This can mean a steel platform extension with a leveler deck and formed concrete pit at each dock position, a surface-mounted edge-of-dock solution for leased spaces that can often be installed quickly, or a modular dock house structure fabricated off-site and craned into place. Pit-style levelers require a formed concrete pit at each dock position, with concrete aprons typically 7 to 8 inches thick. Get a Reno handles all concrete work, steel erection, leveler installation, dock bumper mounting (14 to 24 inches above the drive approach), and installation of climate control and safety equipment.\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cstrong\u003eTesting and Handover\u003c\/strong\u003e Every dock leveler, vehicle restraint, and trailer locks are tested under load as part of restraint safety checks before handover. OSHA requires dockboards to support intended loads and be secured against movement, and Get a Reno verifies compliance with \u003ca href=\"https:\/\/www.osha.gov\/sites\/default\/files\/laws-regs\/federalregister\/2016-11-18.pdf\"\u003e29 CFR 1910.26\u003c\/a\u003e and ANSI\/ASME MH14.1 standards. Your team receives training on new equipment operation and a maintenance schedule.\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003ch2\u003eProject Details and Dock Leveler Specifications\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cstrong\u003eExtension Types:\u003c\/strong\u003e Steel platform extensions, reinforced concrete dock additions, modular pre-fabricated dock house structures, and multi-level configurations for facilities with mixed ground-level and dock-height needs\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cstrong\u003eCapacity Options:\u003c\/strong\u003e Dock levelers rated from 25,000 to 80,000+ pounds to match your forklift, cargo, and trailer loads\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cstrong\u003eLeveler Types:\u003c\/strong\u003e Key features include pit levelers and mechanical dock levelers (rated for 10 to 30 cycles per day), hydraulic levelers (ideal for over 20 loads per day), air powered levelers (using an airbag system for operation), and vertical dock levelers (which provide the best energy efficiency among leveler types)\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cstrong\u003eEdge-of-Dock Levelers:\u003c\/strong\u003e Handle a limited height range of 3 inches; usable widths of 66, 72, 78, and 84 inches; simple installation without cutting new pits\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cstrong\u003eLeveler Pit Dimensions:\u003c\/strong\u003e Custom-sized per load rating; concrete grade and wall thickness calibrated to static plus dynamic forces\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cstrong\u003eIntegration Services:\u003c\/strong\u003e Dock seal and dock shelter installation, dock bumper mounting, vehicle restraint systems to prevent trailer creep and early departure, exterior door and overhead door fitting, dock lights providing adequate lighting at a minimum of 10 foot-candles, and traffic lights for bay status\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cstrong\u003eTimeline:\u003c\/strong\u003e Most Get a Reno extensions complete in 2 to 4 weeks depending on scope; individual leveler or modular installations finish in 2 to 4 days\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cstrong\u003eWarranty:\u003c\/strong\u003e 5-year structural warranty on all Get a Reno extension work\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cstrong\u003eSafety and Compliance:\u003c\/strong\u003e All work meets \u003ca href=\"https:\/\/codes.iccsafe.org\/content\/IBC2024P1\/chapter-16-structural-design\"\u003eIBC Chapter 16 structural design\u003c\/a\u003e requirements, OSHA dockboard regulations, and applicable state\/local codes for guardrails and platform safety\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2\u003eWho Benefits From Get a Reno's Loading Dock Extensions and Dock Positions\u003c\/h2\u003e\n\u003cp\u003e\u003cstrong\u003eManufacturing facilities\u003c\/strong\u003e running out of dock positions gain the most immediate capacity relief. Adding dock doors lets more trucks load and unload concurrently, cutting queue times and reducing idle labor hours.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eDistribution centers and 3PLs\u003c\/strong\u003e with growing shipping volumes need extensions that protect inventory from weather, pests, and temperature swings. Dock seals prevent energy loss over time, and dock seals stop pests from entering the building. Get a Reno installs both as standard on every enclosed extension, delivering measurable energy savings.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eTenants in leased industrial spaces\u003c\/strong\u003e need relocatable solutions. Edge-of-dock levelers and surface-mounted equipment install without cutting into the building's floor slab, making them removable at lease end. Loading docks are typically placed on the rear or side of buildings, and Get a Reno can add exterior dock positions in locations that match your logistics flow without altering the primary structure.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eFacilities with mixed vehicle fleets\u003c\/strong\u003e benefit from extensions designed for varying trailer sizes. Telescoping lip levelers with 24-inch reach and adjustable dock shelters handle everything from standard 53-foot trailers to box trucks. Dock bumpers absorb trailer impact to prevent damage, and trailer restraints prevent trailers from moving during loading, protecting both truck drivers and dock workers.\u003c\/p\u003e\n\u003cp\u003eOne dock position per 10,000 square feet is the standard planning benchmark. If your facility has outgrown that ratio, a Get a Reno extension closes the gap at a fraction of the cost of new construction.\u003c\/p\u003e\n\u003ch2\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003cp\u003e\u003cstrong\u003eHow long does a loading dock extension project take?\u003c\/strong\u003e Most Get a Reno extensions complete within 2 to 4 weeks. A single dock door addition with a mechanical dock leveler or hydraulic unit can finish in under a week. Full multi-bay extensions with new pits, electrical, and dock equipment run 3 to 4 weeks. Get a Reno provides a detailed phase schedule before construction begins.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eWill extensions work with our existing equipment?\u003c\/strong\u003e Yes. Get a Reno designs every extension to integrate with your current dock levelers, dock seals, overhead doors, and vehicle restraint systems. Pit dimensions, lip length, and bumper alignment are matched to your existing dock doors and trailer fleet. If existing equipment needs replacement, Get a Reno installs dock levelers and edge-of-dock levelers for retrofitted bays as part of the project scope.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eWhat types of levelers does Get a Reno install?\u003c\/strong\u003e Mechanical dock levelers for facilities running 10 to 30 cycles per day. Hydraulic dock levelers with hydraulic cylinders for high-cycle environments exceeding 20 loads daily. Air powered levelers for moderate use. Vertical dock levelers where energy efficiency is the priority. Each type is sized to your capacity requirements.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eDo we need permits for a dock extension?\u003c\/strong\u003e Dock extensions involve structural modifications requiring engineering and permitting capabilities. Get a Reno handles all permit applications, structural engineering submittals, and code compliance documentation. When hiring a contractor for loading dock extensions, verify licenses and general liability coverage; Get a Reno carries both general liability and workers' compensation insurance for all projects.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eWhat if we're not satisfied with the results?\u003c\/strong\u003e Get a Reno provides a 5-year structural warranty and backs every project with quality verification at handover. Preventative maintenance and repair services for loading docks are offered after project completion to keep your extension performing at spec.\u003c\/p\u003e\n\u003ch2\u003eReady to Expand Your Loading Capacity?\u003c\/h2\u003e\n\u003cp\u003eInsufficient dock positions cost you truck turnaround time, labor hours, and shipping flexibility every day they go unaddressed. Get a Reno's loading dock extension services add the capacity your facility needs with cost savings over conventional construction and minimal disruption to your operations.\u003c\/p\u003e\n\u003cp\u003eCall \u003cstrong\u003e(929) 294-7360\u003c\/strong\u003e or email \u003cstrong\u003esupport@getareno.com\u003c\/strong\u003e to schedule a free site assessment.\u003c\/p\u003e\n\u003cp\u003eVisit \u003ca href=\"https:\/\/www.getareno.com\"\u003ewww.getareno.com\u003c\/a\u003e for more information on Get a Reno's industrial construction services.\u003c\/p\u003e","brand":"Get a Reno","offers":[{"title":"Day Rate","offer_id":45831779713203,"sku":null,"price":399.99,"currency_code":"USD","in_stock":true},{"title":"1\/2 Day Rate","offer_id":45831779745971,"sku":null,"price":249.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0732\/9700\/2675\/files\/GetaReno_Services_DataCenter_RoofingReplacements_Reinforcements_1500x1500_d3ded04f-8f24-4e49-ac1c-a66b23b6985e.png?v=1786718071","url":"https:\/\/www.getareno.com\/es\/products\/roofing-replacements-structural-reinforcements","provider":"Get a Reno","version":"1.0","type":"link"}